Halo! Kami sedang menyiapkan konten Bahasa Indonesia. Sementara itu, silakan lihat konten Bahasa Inggris di bawah.

Kapasitas Manufaktur Spektrum Penuh

Desain die, hot die forging, perlakuan panas, CNC, NDT — satu atap.

Hot Forging Press in Operation

Material yang Kami Kerjakan

Enam keluarga material untuk aplikasi teknik.

Jenis MaterialGrade / StandardForging TempTypical Applications
Carbon SteelQ235, Q345, 45#, 20Cr, 40Cr900-1200°CKomponen struktural umum, poros, roda gigi
Alloy Steel42CrMo, 35CrMo, 18CrNiMo7-61100-1250°CKomponen struktural dan transmisi kekuatan tinggi
Stainless Steel304, 316L, 410, 17-4PH1050-1180°CKomponen tahan korosi untuk makanan/farmasi
Aluminum6061, 6082, 7075, 2024380-480°CKomponen ringan otomotif dan kedirgantaraan
TitaniumTi-6Al-4V (Grade 5)900-980°CKomponen ringan berkekuatan tinggi untuk kedirgantaraan dan medis
Nickel AlloysInconel 625/718, Hastelloy1050-1180°CKomponen suhu tinggi dan tahan korosi

Spesifikasi & Standar

Weight Range

0.1 kg to 500 kg per piece. From small precision components to large structural forgings.

Tolerance

Down to ±0.2 mm on critical dimensions. ISO 2768-m or tighter on request.

Maximum Dimensions

Parts up to 1200 mm in length, 800 mm width. Complex geometries possible with custom dies.

Quality Standards

Process control per ISO 9001. Material certifications, dimensional reports, NDT included.

Kapasitas Manufaktur In-House

Hot Forging

Tempa panas — Press 1.000-5.000 ton, pengumpanan otomatis.

Heat Treatment

Perlakuan panas — normalizing, quenching, tempering, annealing.

CNC Machining

Mesin CNC — 3-sumbu dan 5-sumbu.

Surface Finishing

Finishing permukaan — shot blasting, phosphating, painting, Dacromet.

NDT Testing

Pengujian non-destruktif — UT, MPI, inspeksi dimensional.

Assembly

Assembly & Kitting — sub-assembly, welding, and packaging for direct delivery to your production line.

Capability Deep Dives

Four subsystems, each documented down to the numbers a buyer can check.

Engineering & Design

Drawing review in 3 working days, die layout in 5–8, tonnage and stage count calculated from projected area. Die steel, shrinkage, draft and tolerance stack fixed before the cavity is cut.

Die Making & Machining

A new die set in 3–4 weeks from a released layout: rough milling, vacuum heat treatment, 5-axis finishing, EDM for closed cavities, try-out before the first article.

Equipment Reliability

Hydraulic, bearing and control faults with symptom, cause and check order — plus the inspection sheet and control log that catch a stop before it happens.

Quality & NDT

UT and MPI to the level the drawing names, dimensional reports with instrument and datum stated, first article from a CMM in a 20 ± 2 °C room.

Our Factory & Workshop

State-of-the-art manufacturing facility in China.

Dapatkan Penawaran Komersial

Describe your project requirements for a technical feasibility assessment and quotation.

wuq268022@gmail.com