One-stop: die design, hot die forging, heat treatment, CNC machining, and NDT under one roof.
Six material families for the most common engineering applications.
| Material Type | Grade / Standard | Forging Temp | Typical Applications |
|---|---|---|---|
| Carbon Steel | Q235, Q345, 45#, 20Cr, 40Cr | 900-1200°C | Common structural components, shafts, gears |
| Alloy Steel | 42CrMo, 35CrMo, 18CrNiMo7-6 | 1100-1250°C | High-strength structural and transmission parts |
| Stainless Steel | 304, 316L, 410, 17-4PH | 1050-1180°C | Corrosion-resistant parts for food/pharma equipment |
| Aluminum | 6061, 6082, 7075, 2024 | 380-480°C | Lightweight automotive and aerospace parts |
| Titanium | Ti-6Al-4V (Grade 5) | 900-980°C | High-strength lightweight parts for aerospace and medical |
| Nickel Alloys | Inconel 625/718, Hastelloy | 1050-1180°C | High-temperature, corrosion-resistant parts |
0.1 kg to 500 kg per piece. From small precision components to large structural forgings.
Down to ±0.2 mm on critical dimensions. ISO 2768-m or tighter on request.
Parts up to 1200 mm in length, 800 mm width. Complex geometries possible with custom dies.
Process control per ISO 9001. Material certifications, dimensional reports, NDT included.
Hot Forging — 1,000–5,000 ton presses with automatic feeding and temperature control.
Heat Treatment — normalizing, quenching, tempering, annealing, and aging. Controlled atmosphere furnaces.
CNC Machining — 3-axis and 5-axis machining centers for finish machining of forgings.
Surface Finishing — shot blasting, phosphating, painting, and Dacromet coating.
Non-Destructive Testing — ultrasonic (UT), magnetic particle (MPI), and dimensional inspection.
Assembly & Kitting — sub-assembly, welding, and packaging for direct delivery to your production line.
Four subsystems, each documented down to the numbers a buyer can check.
Drawing review in 3 working days, die layout in 5–8, tonnage and stage count calculated from projected area. Die steel, shrinkage, draft and tolerance stack fixed before the cavity is cut.
A new die set in 3–4 weeks from a released layout: rough milling, vacuum heat treatment, 5-axis finishing, EDM for closed cavities, try-out before the first article.
Hydraulic, bearing and control faults with symptom, cause and check order — plus the inspection sheet and control log that catch a stop before it happens.
UT and MPI to the level the drawing names, dimensional reports with instrument and datum stated, first article from a CMM in a 20 ± 2 °C room.
State-of-the-art manufacturing facility in China.
Describe your project requirements for a technical feasibility assessment and quotation.